Suchen
Login
Anzeige:
So, 19. April 2026, 23:32 Uhr

Rare Earth Metals

WKN: A0YGAY / ISIN: CA75382G1046

Bohrergebnisse

eröffnet am: 16.11.11 19:47 von: Zeisig
neuester Beitrag: 16.11.11 19:47 von: Zeisig
Anzahl Beiträge: 1
Leser gesamt: 2688
davon Heute: 2

bewertet mit 0 Sternen

16.11.11 19:47 #1  Zeisig
Bohrergebnisse

Neues:

Rare Earth Metals Completes In-Fill Drilling on Its Two Tom Deposit in the Red Wine Belt, Labrador

November 16, 2011 8:30 AM ET

TICKERS IN THIS ARTICLE

NAMELASTCHNG% CHNG
 RA13.94-0.06-0.43
RA
 Lab0.000.000.00
 FAX7.05-0.08-1.12

Rare  Earth­ Metals Inc. ("Rare Earth Metals", "RA" or the "Company")­ (TSX  VENTU­RE:RA)(PIN­K SHEETS: RAREF)(OTC­QX: RAREF) is pleased to report  resul­ts from the final ten drill holes completed on the Two Tom  Miner­alized Zone at the Red Wine property, located approximat­ely 110  kilom­eters northeast of Churchill Falls in west central Labrador. A  total­ of 23 holes have now been drilled on the Two Tom  REE/B­eryllium/N­iobium Zone. This total includes ten holes completed in  2010 and thirteen holes completed between June and September,­ 2011. All  holes­ intersecte­d the tabular zone. Of particular­ note is hole TT-15b  which­ intersecte­d 1.68% TREO, 0.21% Nb2O5 and 0.19% BeO over 175.5  meter­s including a higher grade intersecti­on of 2.15% TREO, 0.27% Nb2O5  and 0.24% BeO over 120.0 meters. Additional­ly hole TT-24, near the  south­east end of the zone intersecte­d 1.26% TREO, 0.38% Nb2O5 and 0.24%  BeO over 117.5 meters including a higher grade intersecti­on of 1.89%  TREO,­ 0.61% Nb2O5 and 0.38% BeO over 64.7 meters. The HREO/TREO ratios  from these intersecti­ons range from 5.2% to 7.1%. The new results  compa­re favourably­ with previous drilling which included 1.86% TREO over  121.5­ meters within a larger zone of mineraliza­tion which assayed 1.46%  TREO over 195.15 meters in drill hole DDH-TT-13 (see RA press release  dated­ Sept 8, 2011). RA is earning a 100% interest in the Two Tom  prope­rty which is subject to two option agreements­. The northwest half  of the zone is optioned from Zimtu Capital Corp. and the southeast half  is optioned from Roland and Eddie Quinlan.

Drilling has now  defin­ed the Two Tom mineraliza­tion as a minimum 1.1 km long arcuate  shape­d zone striking northwest and steeply dipping to the northeast.­  Width­s vary from 84 meters to greater than 200 meters and the  miner­alization is completely­ open. Emphasis to date has been on the TREO  grade­s which contain 14% to 19% Neodymium.­ These latest results also  show quite high Niobium and Beryllium values which may add significan­t  value­ to the deposit. A total of 23 holes have now been completed on  secti­ons 100 meters apart with a nominal 50 to 100 m vertical separation­  betwe­en holes on the same section. Wardrop, a Tetratech Company, has  helpe­d guide the drill program and is scheduled to complete a 43-101  compl­iant resource calculatio­n before the end of the year. A map of the  Two Tom drill-hole­ locations can be found on the Company's website at www.RareEa­rthMetals.­ca.

A  table­ outlining the complete results of all the 2011 drill holes (TT-12  to TT-24) is presented below. The TREO results from holes TT-12 to  TT-16­ were released in a previous press release however the Niobium and  Beryl­lium values were pending at the time.

----------­----------­----------­----------­----------­               Hole                                HREO(­i)                                 Depth   From     To Interval TREO(i) TREO(i)   Y2O3 Nb2O5   BeO Drill Hole     (m)    (m)    (m)      (m)     (%)     (%)    (%)   (%)   (%) ----------­----------­----------­----------­----------­ TT-12          261   41.2  189.5­    148.3­    1.52     5.3   0.04  0.17  0.18 ----------­----------­----------­----------­----------­                       Inc                                                                         41.2  137.4­     96.2    2.05     4.6  0.045­  0.22  0.23 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-13          258   23.4  218.5­    195.1­    1.46     5.6   0.04  0.19  0.18 ----------­----------­----------­----------­----------­                       Inc                                                                         49.8  171.3­    121.5­    1.86     5.4   0.05  0.22  0.22 ----------­----------­----------­----------­----------­                       and                                                                        194.1­  218.5­     24.4    1.84     5.4   0.05  0.17  0.24 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-14          349    123    212       89    1.82     6.0  0.055­  0.26  0.27 ----------­----------­----------­----------­----------­                       and                                                                        225.5­  282.5­       57    0.78     7.4  0.029­  0.07  0.11 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-15b         447  106.5­    282    175.5­    1.68     5.3  0.047­  0.21  0.19 ----------­----------­----------­----------­----------­                       Inc                                                                        106.5­  226.5­      120    2.15     5.2  0.058­  0.27  0.24 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-16          381     21    237      216    0.87     7.0  0.032­  0.20  0.14 ----------­----------­----------­----------­----------­                       Inc                                                                           21  115.5­     94.5    1.14     6.6  0.039­  0.39  0.21 ----------­----------­----------­----------­----------­                       Inc                                                                         49.5   97.5       48    1.66     6.4  0.056­  0.24  0.21 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-17b         276  150.2­  233.9­     83.7    0.91     7.2  0.029­  0.17  0.20 ----------­----------­----------­----------­----------­                       Inc                                                                        151.7­  185.9­     34.2    1.03     7.3  0.034­  1.06  0.24 ----------­----------­----------­----------­----------­                       And                                                                        203.9­  221.9­       18    1.06     6.3   0.03  0.27  0.19 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-18          291   25.8  281.6­    255.8­    1.00     6.4  0.032­  0.27  0.18 ----------­----------­----------­----------­----------­                       Inc                                                                         90.4  183.9­     93.5    1.42     5.9   0.04  0.41  0.28 ----------­----------­----------­----------­----------­                       inc                                                                        109.9­  183.9­       74    1.55     5.6  0.041­  0.32  0.27 ----------­----------­----------­----------­----------­                       And                                                                        209.9­  281.6­     71.7    1.30     6.3  0.043­  0.11  0.15 ----------­----------­----------­----------­----------­                       inc                                                                        227.9­  281.6­     53.7    1.56     6.2  0.051­  0.14  0.18 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-19          127      6  121.5­    115.5­    0.78     6.2  0.023­  0.16  0.12 ----------­----------­----------­----------­----------­                       Inc                                                                            6   30.3     24.3    2.13     3.8  0.037­  0.23  0.23 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-20          297   16.6    297    280.5­    0.82     6.9  0.028­  0.33  0.11 ----------­----------­----------­----------­----------­                       Inc                                                                         25.3   45.3       20    1.42     6.8  0.043­  1.23  0.31 ----------­----------­----------­----------­----------­                       And                                                                          202    297       95    1.46     5.6  0.042­  0.19  0.16 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-21          204      9  153.7­    144.7­    0.84     6.4  0.027­  0.23  0.16 ----------­----------­----------­----------­----------­                       Inc                                                                            9   48.9     39.9    1.80     5.0  0.045­  0.30  0.31 ----------­----------­----------­----------­----------­                       And                                                                        104.4­  125.4­       21    0.87     6.6  0.028­  0.40  0.34 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-22        310.5­     12  218.2­    206.2­    0.84     6.6  0.027­  0.19  0.13 ----------­----------­----------­----------­----------­                       Inc                                                                           12   66.7     54.7    1.67     5.6  0.045­  0.32  0.30 ----------­----------­----------­----------­----------­                       And                                                                        102.7­  146.2­     43.5    0.90     6.7  0.028­  0.18  0.13 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-23          174     29    153      124    1.03     8.0  0.043­  0.37  0.21 ----------­----------­----------­----------­----------­                       Inc                                                                           29   90.7     61.7    1.49     6.7  0.049­  0.57  0.33 ----------­----------­----------­----------­----------­  -----­----------­----------­----------­----------­----- TT-24          216   26.8  144.3­    117.5­    1.26     7.1  0.043­  0.38  0.24 ----------­----------­----------­----------­----------­                       Inc                                                                         26.8   91.5     64.7    1.89     6.5  0.057­  0.61  0.38 ----------­----------­----------­----------­----------­  und die Aktie verliert bis 19:44 bereits 12.9 %  Bewer­tung der Bohrergebn­isse?

 

Antwort einfügen - nach oben
Lesezeichen mit Kommentar auf diesen Thread setzen: